Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Muruj (near Tarout)

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Muruj (near Tarout)

Bathroom waterproofing in Al Muruj begins with photos of the floor, the wall base and the drain, sent by call or WhatsApp. We serve the district in the Eastern Province, and the work can be done at the build stage or after tiling.

Al Muruj is largely made up of homes and mid-sized residential buildings, with some wider plots as well. In older bathrooms damp often appears at the wall base and around the drain, where the membrane wears with age. In new bathrooms the right time is just before tiling, when the floor is easiest to treat.

  • Al Muruj is a district in the Eastern Province, near Al Jamiyin, As Sinaiyah and Ar Rawdah.
  • In older bathrooms the membrane beneath the tiles can wear out before any sign shows on the surface.
What the service includes

The main items of bathroom waterproofing in Al Muruj (near Tarout)

  • Applying a continuous waterproof layer rising at walls and corners
  • Checking the floor, wall bases, corners and the drain opening
  • Leaving the layer to cure before any finish goes over it
  • Cleaning the surface and treating hairline cracks and pipe entries
How we work

The steps of bathroom waterproofing in Al Muruj (near Tarout)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Start from Al Muruj (near Tarout) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Al Muruj (near Tarout) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing in Al Muruj (near Tarout)

How can I tell if the membrane in my Al Muruj bathroom has failed?

Damp patches may show on an adjoining wall or at the base, or moisture may linger after showering. Only a photo check confirms it, so send what you have and we will identify the cause.

Can a bathroom in a house being built in Al Muruj now be waterproofed?

Yes, this is a good time to waterproof before tiling. Send photos of the current floor and walls, and we will set the right step for that stage.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

What materials are used in bathroom waterproofing?

Common materials include flexible cementitious coating applied in layers on damp-tolerant surfaces, liquid membrane applied by brush or roller and shaped by the surface, and bitumen rolls fixed to the floor and wall bases. The choice of material depends on the stage of the work and the nature of the surface.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Do you cover Al Muruj (near Tarout)?

Yes. We serve Al Muruj (near Tarout) and nearby areas such as Al Jamiyin (near Tarout), As Sinaiyah (near Tarout) and Ar Rawdah (near Tarout), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Areas near Al Muruj (near Tarout)

We also work near Al Muruj (near Tarout), in Al Jamiyin (near Tarout), As Sinaiyah (near Tarout) and Ar Rawdah (near Tarout).

Other services in the area

More services in Al Muruj (near Tarout)

Two workers on the roof insulating around an AC unit

We start with you in Al Muruj (near Tarout)
with one call

Describe the problem and where it is in Al Muruj (near Tarout), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp