Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Matar District

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Matar District

We carry out bathroom waterproofing in Al Matar District, Hofuf, covering floors, washroom bases and drain openings, at the build stage or after tiling. Begin by sending bathroom photos by call or WhatsApp.

The district consists of detached houses, villas and residential buildings, and lies near Imam Muhammad Ibn Saud Islamic University, so its bathrooms range from new to long-standing. Older bathrooms usually show damp at wall bases and around drains, while newer ones are best lined before tiling. The photos reveal the condition of the floor and joints before a method is chosen.

  • Al Matar District is a residential district in Hofuf, Eastern Province, located near Imam Muhammad Ibn Saud Islamic University, Al Quds District and As Suqur District.
  • Damp in bathrooms often starts at a small gap between tile and wall rather than in the middle of the floor.
What the service includes

The main items of bathroom waterproofing in Al Matar District

  • Leaving the layer to cure before any finish goes over it
  • Cleaning the surface and treating hairline cracks and pipe entries
  • Checking the floor, wall bases, corners and the drain opening
  • Closing the drain opening ring and the bathroom door threshold
How we work

The steps of bathroom waterproofing in Al Matar District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

Al Matar District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Matar District and around itIncluding Imam Muhammed Ibn Saud Islamic University District, Al Quds District and As Suqur District, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing in Al Matar District

Can a bathroom of some age in Al Matar District be waterproofed?

Often yes, provided the floor and the concrete beneath the tiles are sound. The photos show whether any damage needs repair before lining.

What determines the waterproofing method for a bathroom in the district?

It is determined by the condition of the floor and joints, the position of the drain, and whether the bathroom is newly built or long established. Send the photos and we will review these with you.

Can the bathroom floor be waterproofed without lifting the tiles?

In some cases yes: if joints and cracks are limited and the tile surface is sound, sealing the joints or applying a clear waterproof coat over the tiles can work. But if the layer under the tiles is missing or the leak is advanced, lifting them is the right treatment. Send photos and we will advise.

What materials are used in bathroom waterproofing?

Common materials include flexible cementitious coating applied in layers on damp-tolerant surfaces, liquid membrane applied by brush or roller and shaped by the surface, and bitumen rolls fixed to the floor and wall bases. The choice of material depends on the stage of the work and the nature of the surface.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Do you offer bathroom waterproofing in Al Matar District?

Yes. Al Matar District is within our service area in the Eastern Province, and we also work in Imam Muhammed Ibn Saud Islamic University District, Al Quds District and As Suqur District. Call us or send photos of the spot on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Matar District, in Imam Muhammed Ibn Saud Islamic University District, Al Quds District and As Suqur District.

Other services in the area

More services in Al Matar District

Two workers on the roof insulating around an AC unit

Tell us about your site in Al Matar District
and we will plan the next step with you

Describe the problem and where it is in Al Matar District, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp