Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Mahar

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Mahar

We waterproof bathrooms in Al Mahar, covering floors, wall bases and drain openings, whether during construction or after tiling. Send bathroom photos by call or WhatsApp so we can determine the condition before choosing a method.

Al Mahar is a residential district in Dhahran of houses and small compounds, where bathrooms see very different levels of use between larger and smaller households. Heavily used bathrooms tend to wear their membrane faster around the drain and beside the bath. The work here focuses on the junctions between the floor, the bath and the wall, since these are most exposed to water leaking through over time.

  • Al Mahar is a residential district in Dhahran in the Eastern Province, lying near Inak, Al Bustan One and Al Aqiq.
  • The junction where a bath meets the floor is the most exposed point for leaks, and it is examined before the rest of the bathroom.
What the service includes

The bathroom waterproofing work in Al Mahar

  • Cleaning the surface and treating hairline cracks and pipe entries
  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Closing the drain opening ring and the bathroom door threshold
  • Leaving the layer to cure before any finish goes over it
How we work

The stages of the work in Al Mahar

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

Bathroom waterproofing in Al MaharWe choose the method and the materials once we know the condition of the spot.

Start from Al Mahar with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing in Al Mahar

Is the bath area waterproofed together with the floor in an Al Mahar home?

Yes, because the bath and its junction with the floor and wall are among the most leak-prone spots. We treat them as one part of the work unless the photos show the problem is confined to one point.

What should I prepare before sending photos of my Al Mahar bathroom?

No special preparation is needed. Take clear photos of the floor, the bath and the drain, and point out any spots where you see wetness or damp, which is enough to begin.

Can the bathroom floor be waterproofed without lifting the tiles?

In some cases yes: if joints and cracks are limited and the tile surface is sound, sealing the joints or applying a clear waterproof coat over the tiles can work. But if the layer under the tiles is missing or the leak is advanced, lifting them is the right treatment. Send photos and we will advise.

What should I send you from Al Mahar?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Mahar, and we will work out the next step with you.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Is kitchen waterproofing different from bathroom waterproofing?

The principle is the same: a continuous layer under the tiles around wet areas and wall bases. But the risk points in a kitchen differ: around the sink, the dishwasher connection and the floor drain, and the need is greater in kitchens above living space. Each service covers its own details separately.

Nearby areas

Areas near Al Mahar

We also work near Al Mahar, in Inak, Al Bustan One and Al Aqiq (near Inak).

Other services in the area

More services in Al Mahar

Two workers on the roof insulating around an AC unit

Tell us about your site in Al Mahar
and we will plan the next step with you

Describe the problem and where it is in Al Mahar, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp