Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Khudud District

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Khudud District

Bathroom waterproofing in Al Khudud District begins with photos of the floor, base and lower walls sent by call or WhatsApp. The district contains various houses and villas, some needing initial waterproofing and others requiring repair of existing waterproofing.

Al Khudud District has houses and villas varying in size and age, with bathrooms of different construction and finishing types. Older bathrooms often suffer chronic leaks and visible damp around the floor and base because the original waterproofing has degraded over time. Newer bathrooms need reliable waterproofing before tiling to protect the underlying structure. Your photos will help us assess whether there is prior waterproofing and its current state.

  • Al Khudud District is in the Eastern Province, located near As Sulaimaniyah District, Al Luwaymi District and Ayn Musa District, comprising scattered houses and villas.
  • A bathroom in a house experiences rapid shifts between heat and high humidity, putting waterproofing under stress to handle both water and steam.
What the service includes

The main items of bathroom waterproofing in Al Khudud District

  • Leaving the layer to cure before any finish goes over it
  • Applying a continuous waterproof layer rising at walls and corners
  • Closing the drain opening ring and the bathroom door threshold
  • Treating washroom floors and wet surfaces with the material suited to each condition
How we work

This is how we work in Al Khudud District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

We serve Al Khudud District and around itIncluding As Sulaimaniyah District, Al Luwaymi District and Ayn Musa District, as part of our work across the Eastern Province.

Your request from Al Khudud District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Khudud District

Does damp in a Al Khudud bathroom mean the old waterproofing has completely failed?

Not necessarily. The waterproofing may be sound but drainage poor, or there may only be small cracks in certain spots. Photos and a direct call help us pinpoint the problem's scope and the right fix.

Can a bathroom in Al Khudud be waterproofed without removing old tiling?

It depends on the condition of the tiling and waterproofing underneath. If the tiling is sound and only the joints and openings are problematic, we can treat them from above. But if the tiling is cracked or leaks are deep, removal may be necessary. Photos will show us this.

Can the bathroom floor be waterproofed without lifting the tiles?

In some cases yes: if joints and cracks are limited and the tile surface is sound, sealing the joints or applying a clear waterproof coat over the tiles can work. But if the layer under the tiles is missing or the leak is advanced, lifting them is the right treatment. Send photos and we will advise.

Why does damp appear on the ceiling of the room below the bathroom?

Water gets in through the drain opening, pipe entries or the corner between the floor and the wall, then travels horizontally inside the slab until it appears somewhere else. The stain on the ceiling can be far from the actual entry point. Photos from above and below help us trace the source.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Do you cover Al Khudud District?

Yes. We serve Al Khudud District and nearby areas such as As Sulaimaniyah District, Al Luwaymi District and Ayn Musa District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: As Sulaimaniyah District, Al Luwaymi District and Ayn Musa District.

Other services in the area

More services in Al Khudud District

Two workers on the roof insulating around an AC unit

Your first step in Al Khudud District:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp