Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Khalidiyah Ash Shamaliyah

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Khalidiyah Ash Shamaliyah

Bathroom waterproofing in Al Khalidiyah Ash Shamaliyah covers floors, wall bases and drain openings, whether the work is done at the build stage or after tiling. Send photos of the bathroom and its drain by call or WhatsApp, and we will advise which parts need attention. We serve Al Khalidiyah Ash Shamaliyah in the Eastern Province.

Al Khalidiyah Ash Shamaliyah is made up mostly of villas and small residential buildings, and many of its bathrooms sit on the ground floor beside wet areas and a floor drain. Where tiling has been laid over an older floor, the joints and the junction with the wall are the usual places where water finds its way through. In a new build, the screed and the wall base can be treated before the tiles go down, which is simpler than working around finished surfaces. The photos will show whether the trouble is in the floor, the wall base or the drain, and that decides where the work starts.

  • Al Khalidiyah Ash Shamaliyah is a district in the Eastern Province, lying close to First Industrial and Al Khalidiyah Al Janubiyah.
  • Bathroom floors are wet every day, so the joint at the drain and the wall base carry most of the load.
What the service includes

What we do for you in Al Khalidiyah Ash Shamaliyah

  • Leaving the layer to cure before any finish goes over it
  • Applying a continuous waterproof layer rising at walls and corners
  • Cleaning the surface and treating hairline cracks and pipe entries
  • Closing the drain opening ring and the bathroom door threshold
How we work

From first contact to the finished job in Al Khalidiyah Ash Shamaliyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Start from Al Khalidiyah Ash Shamaliyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bathroom waterproofing in Al Khalidiyah Ash ShamaliyahWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Khalidiyah Ash Shamaliyah

Can bathroom waterproofing be added after tiles are laid?

Often yes, in Al Khalidiyah Ash Shamaliyah, where many bathrooms were tiled before anyone checked the floor beneath. It depends on the condition of the base and the drain, and the photos will show whether the existing tiles can stay.

Do you treat drain openings in older Khalidiyah homes?

Yes, we treat the drain opening as part of the floor work. Send a photo of the drain and the floor edge, and tell us whether the bathroom is on the ground floor or upstairs, so we can judge the access.

Can the bathroom floor be waterproofed without lifting the tiles?

In some cases yes: if joints and cracks are limited and the tile surface is sound, sealing the joints or applying a clear waterproof coat over the tiles can work. But if the layer under the tiles is missing or the leak is advanced, lifting them is the right treatment. Send photos and we will advise.

How often should a bathroom be waterproofed in a building's life?

There is no fixed interval. The layer is affected by how well it was first applied, by movement in the building, by shocks to the tiles and by changes to the plumbing. The main signal is damp patches appearing or render crumbling at the wall base, not a date. At the first sign, send us a photo.

Do you cover Al Khalidiyah Ash Shamaliyah?

Yes. We serve Al Khalidiyah Ash Shamaliyah and nearby areas such as First Industrial (near Dammam), Al Khalidiyah Al Janubiyah and An Nasriyah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Nearby areas

Areas near Al Khalidiyah Ash Shamaliyah

We also work near Al Khalidiyah Ash Shamaliyah, in First Industrial (near Dammam), Al Khalidiyah Al Janubiyah and An Nasriyah.

Other services in the area

More services in Al Khalidiyah Ash Shamaliyah

Two workers on the roof insulating around an AC unit

Tell us about your site in Al Khalidiyah Ash Shamaliyah
and we will plan the next step with you

Call us or send photos of the floor and wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp