Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Jabal

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Jabal

Bathroom waterproofing in Al Jabal starts with photos of the floor, walls and drain points, sent by call or WhatsApp. The district has houses and villas of varied ages, and the waterproofing method depends on whether the bathroom is under construction or already tiled.

Al Jabal's houses have older and newer bathrooms, with varying drain and pipe layouts. A bathroom already tiled needs special treatment to reach the base without removing tiles if possible, while a new bathroom allows full waterproofing before tiling. Coastal humidity affects how long treatment takes to dry, and photos reveal the extent of damage and the best repair method.

  • Al Jabal is a district in the Eastern Province, close to Ad Dirah and Al Nakhil, with varied small houses and villas.
  • A leaking tiled bathroom needs its base inspected before any surface treatment begins.
What the service includes

What the service covers in Al Jabal

  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Leaving the layer to cure before any finish goes over it
  • Checking the floor, wall bases, corners and the drain opening
  • Closing the drain opening ring and the bathroom door threshold
How we work

The stages of the work in Al Jabal

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

Start from Al Jabal with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Al Jabal is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Jabal

Can a tiled bathroom in Al Jabal be waterproofed without removing the tiles?

That depends on where the leak is and how much damage there is. If it is at the base or drain, we may reach it from underneath or the side without removing all the tiles. Send photos of the damp areas and damaged tiles so we can decide together.

Do you waterproof bathrooms under construction in Al Jabal?

Yes, waterproofing at the building stage before tiling provides stronger protection. Tell us about the work stages and the drain and pipe locations so we can help with the right plan.

Is kitchen waterproofing different from bathroom waterproofing?

The principle is the same: a continuous layer under the tiles around wet areas and wall bases. But the risk points in a kitchen differ: around the sink, the dishwasher connection and the floor drain, and the need is greater in kitchens above living space. Each service covers its own details separately.

Why does damp appear on the ceiling of the room below the bathroom?

Water gets in through the drain opening, pipe entries or the corner between the floor and the wall, then travels horizontally inside the slab until it appears somewhere else. The stain on the ceiling can be far from the actual entry point. Photos from above and below help us trace the source.

How do I request bathroom waterproofing in Al Jabal?

Call us, or send clear photos of the spot and its location in Al Jabal on WhatsApp, and we will work out the next step with you.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Nearby areas

Areas near Al Jabal

We also offer bathroom waterproofing in Ad Dirah, Al Nakhil (near Tarout) and Tarout, among the closest areas to Al Jabal.

Other services in the area

More services in Al Jabal

Two workers on the roof insulating around an AC unit

Tell us about your site in Al Jabal
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp