Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Hinnah

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Hinnah

Bathroom waterproofing in Al Hinnah starts with a photo of the floor, walls and outlets sent to us by WhatsApp or call. The village has simple and modest homes, whose bathrooms are prone to damp and leaks because groundwater is near and buildings are often old.

Homes in Al Hinnah are mostly old and built with traditional materials, so the bathroom faces constant damp from soil and walls. Water may rise from beneath the floor or leak from joints between pipes and walls. The dry inland climate alternates with periods of high humidity from the nearby coast, increasing the risk of damp and mould. Treating leaks in an old home requires careful work on the mortar and gaps around pipes, and photos help pinpoint where the water is coming from.

  • Al Hinnah is a village in the Eastern Province, near Thaj, As Sahaf and Bakha, with simple homes.
  • A bathroom in an old home constantly needs damp treatment because groundwater is shallow.
What the service includes

What the service covers in Al Hinnah

  • Closing the drain opening ring and the bathroom door threshold
  • Cleaning the surface and treating hairline cracks and pipe entries
  • Checking the floor, wall bases, corners and the drain opening
  • Leaving the layer to cure before any finish goes over it
How we work

The stages of the work in Al Hinnah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

We serve Al Hinnah and around itIncluding Thaj, As Sahaf and Bakha, as part of our work across the Eastern Province.

Start from Al Hinnah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Hinnah

Can water leak up through the floor of an old bathroom in Al Hinnah?

Yes, this is common in old homes when groundwater is near. We treat the floor and walls with waterproofing materials that prevent water rising and protect against leaks. Send photos of the floor and walls so we can pinpoint where the damp is coming from.

How do we protect an old bathroom from mould and damp in Al Hinnah?

With complete waterproofing of the floor, walls and around pipes. We treat cracks and joints and apply layers that stop water seeping from below and the sides. Good ventilation also helps, but waterproofing is the foundation. Photos show the bathroom's condition and what needs to be done.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Why does damp appear on the ceiling of the room below the bathroom?

Water gets in through the drain opening, pipe entries or the corner between the floor and the wall, then travels horizontally inside the slab until it appears somewhere else. The stain on the ceiling can be far from the actual entry point. Photos from above and below help us trace the source.

Is Al Hinnah within your service area?

Yes, Al Hinnah is one of the areas we work in, as are Thaj, As Sahaf and Bakha. To start, call us or message us on WhatsApp.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Nearby areas

Areas near Al Hinnah

Nearby areas we also cover: Thaj, As Sahaf and Bakha.

Other services in the area

More services in Al Hinnah

Two workers on the roof insulating around an AC unit

Tell us about your site in Al Hinnah
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp