Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Bahar (near Ghizlan)

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Bahar (near Ghizlan)

Bathroom waterproofing in Al Bahar starts with photos of the floor, wall bases and drain entries, sent by call or WhatsApp. The district has residential houses and flats near Al Hamra, Al Salam and Ghirnatah, and its bathrooms vary in age and construction.

Bathrooms in coastal districts are exposed to humid air, which can show more on the walls around the bathroom than on the floor. In older buildings the sealing layers beneath the tiles may have weakened over time, letting water in through small points that are not easy to see. The photos reveal whether the damp comes from the floor or the wall.

  • Al Bahar is a coastal residential district in the Eastern Province near Al Hamra, Al Salam and Ghirnatah, with houses and flats.
  • Coastal humidity often shows on the bathroom walls around the floor more than on the floor itself.
What the service includes

The bathroom waterproofing work in Al Bahar (near Ghizlan)

  • Cleaning the surface and treating hairline cracks and pipe entries
  • Closing the drain opening ring and the bathroom door threshold
  • Applying a continuous waterproof layer rising at walls and corners
  • Leaving the layer to cure before any finish goes over it
How we work

From first contact to the finished job in Al Bahar (near Ghizlan)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Al Bahar (near Ghizlan) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Bahar (near Ghizlan) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing in Al Bahar (near Ghizlan)

Why does damp appear on the walls of an Al Bahar bathroom rather than the floor?

Humid coastal air can seep into and settle on walls, and a floor leak may be a separate source. The photos check both floor and wall together to identify the true cause.

Is full sealing suitable for an older bathroom in Al Bahar?

In many cases full sealing is suitable, but it depends on the existing floor. After reviewing the photos we decide whether localised repair is enough or whether full sealing is needed.

How often should a bathroom be waterproofed in a building's life?

There is no fixed interval. The layer is affected by how well it was first applied, by movement in the building, by shocks to the tiles and by changes to the plumbing. The main signal is damp patches appearing or render crumbling at the wall base, not a date. At the first sign, send us a photo.

How do I request bathroom waterproofing in Al Bahar (near Ghizlan)?

Call us, or send clear photos of the spot and its location in Al Bahar (near Ghizlan) on WhatsApp, and we will work out the next step with you.

Is kitchen waterproofing different from bathroom waterproofing?

The principle is the same: a continuous layer under the tiles around wet areas and wall bases. But the risk points in a kitchen differ: around the sink, the dishwasher connection and the floor drain, and the need is greater in kitchens above living space. Each service covers its own details separately.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Bahar (near Ghizlan), in Al Hamra (near Ghizlan), Al Salam (near Ghizlan) and Ghirnatah (near Ghizlan).

Other services in the area

More services in Al Bahar (near Ghizlan)

Two workers on the roof insulating around an AC unit

We start with you in Al Bahar (near Ghizlan)
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp