Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Badr

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Badr

Bathroom waterproofing in Al Badr begins with photos of the floor, base walls and drain pipes sent by call or WhatsApp. The district has residential homes at various stages of construction, and bathrooms here are exposed to moisture that can affect walls and foundations.

Al Badr has residential homes of varying age, with bathrooms ranging from new to renovated. Damp walls around bathrooms are common because pipes and drains may be old or were not properly sealed originally. Photos reveal the leak location and walls affected by moisture. Treating drains and joints is essential before applying any new waterproofing, and an older bathroom may need comprehensive treatment of both floor and walls.

  • Al Badr is a residential district in the Eastern Province, close to Al Bustan One, Inak and Qurtubah, containing homes spread across residential areas.
  • Old pipes and drains in a bathroom often cause damp in neighbouring walls and the house foundation.
What the service includes

The main items of bathroom waterproofing in Al Badr

  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Leaving the layer to cure before any finish goes over it
  • Cleaning the surface and treating hairline cracks and pipe entries
  • Closing the drain opening ring and the bathroom door threshold
How we work

The stages of the work in Al Badr

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Bathroom waterproofing in Al BadrWe choose the method and the materials once we know the condition of the spot.

We serve Al Badr and around itIncluding Al Bustan One, Inak and Qurtubah (near Inak), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Badr

Does damp in bathroom walls mean all the waterproofing has failed?

Not necessarily. The leak may be from a single drain or joint. Photos and inspection pinpoint the water source, and we may treat only one area without rewaterproofing the whole bathroom.

Can we fix external wall damp in a bathroom from inside?

That depends on the source of the damp. If it is from internal drains or pipes, yes; but if the damp comes from outside the house we may need comprehensive treatment. Photos help us identify the right solution.

How often should a bathroom be waterproofed in a building's life?

There is no fixed interval. The layer is affected by how well it was first applied, by movement in the building, by shocks to the tiles and by changes to the plumbing. The main signal is damp patches appearing or render crumbling at the wall base, not a date. At the first sign, send us a photo.

How do I request bathroom waterproofing in Al Badr?

Call us, or send clear photos of the spot and its location in Al Badr on WhatsApp, and we will work out the next step with you.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Is kitchen waterproofing different from bathroom waterproofing?

The principle is the same: a continuous layer under the tiles around wet areas and wall bases. But the risk points in a kitchen differ: around the sink, the dishwasher connection and the floor drain, and the need is greater in kitchens above living space. Each service covers its own details separately.

Nearby areas

The same service in nearby areas

If the site is outside Al Badr, the same service is available in Al Bustan One, Inak and Qurtubah (near Inak).

Other services in the area

More services in Al Badr

Two workers on the roof insulating around an AC unit

In Al Badr and need bathroom waterproofing?
Send us photos of the spot

Describe the problem and where it is in Al Badr, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp