Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Badi (near Al Awjam)

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Badi (near Al Awjam)

Bathroom waterproofing in Al Badi starts with photos of the bathroom floor, walls and drain, sent by call or WhatsApp. We waterproof floors, wall bases and drain openings, whether at the build stage or after tiling.

Al Badi is a district of mixed housing, with newer homes beside older ones, and bathrooms are usually inside the units or next to bedrooms. Dampness appears when tiling goes over an unlined floor, with stains gathering in the corners near the drain. Waste water also runs through pipes close to the walls, so what lies behind the tiles is checked before any lining is chosen. The photos show whether the bathroom needs a full lining or a targeted repair.

  • Al Badi is a district in the Al-Ahsa governorate of the Eastern Province, near Al Badiah and Al Awjam.
  • Pipes running behind walls can leak into the wall before any sign shows on the tiles.
What the service includes

The main items of bathroom waterproofing in Al Badi (near Al Awjam)

  • Cleaning the surface and treating hairline cracks and pipe entries
  • Checking the floor, wall bases, corners and the drain opening
  • Closing the drain opening ring and the bathroom door threshold
  • Leaving the layer to cure before any finish goes over it
How we work

The stages of the work in Al Badi (near Al Awjam)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Start from Al Badi (near Al Awjam) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Al Badi (near Al Awjam) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Badi (near Al Awjam)

Can a bathroom in Al Badi be treated without removing all the tiles?

In some cases yes, since joints and the drain can be treated from above at specific spots. If the leak comes from beneath the floor, the photos will show whether lifting part of the tiling is needed.

How do I start waterproofing a bathroom in Al Badi?

Send photos of the floor, walls and drain by call or WhatsApp, noting whether the bathroom is at build stage or already tiled. We will then explain the steps.

How often should a bathroom be waterproofed in a building's life?

There is no fixed interval. The layer is affected by how well it was first applied, by movement in the building, by shocks to the tiles and by changes to the plumbing. The main signal is damp patches appearing or render crumbling at the wall base, not a date. At the first sign, send us a photo.

Is kitchen waterproofing different from bathroom waterproofing?

The principle is the same: a continuous layer under the tiles around wet areas and wall bases. But the risk points in a kitchen differ: around the sink, the dishwasher connection and the floor drain, and the need is greater in kitchens above living space. Each service covers its own details separately.

Is Al Badi (near Al Awjam) within your service area?

Yes, Al Badi (near Al Awjam) is one of the areas we work in, as are Al Badiah, Al Awjam and Al Aujam. To start, call us or message us on WhatsApp.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Nearby areas

Bathroom waterproofing near Al Badi (near Al Awjam)

If the site is outside Al Badi (near Al Awjam), the same service is available in Al Badiah, Al Awjam and Al Aujam.

Other services in the area

More services in Al Badi (near Al Awjam)

Two workers on the roof insulating around an AC unit

Bathroom waterproofing in Al Badi (near Al Awjam)?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp