Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Adhiriyah

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Adhiriyah

In Al Adhiriyah we waterproof bathrooms after you send photos of the floor, wall bases and drain by call or WhatsApp. The work can be carried out during construction or once the tiling is down.

Al Adhiriyah is a village of scattered homes, villas and small residential clusters, and most of its bathrooms are tiled over concrete floors and screeds. Problems usually sit in the inner floor corners and around the drain opening, where water gathers. Good waterproofing here starts by identifying the route the water takes, which the photos help us see.

  • Al Adhiriyah is a village in the Eastern Province, near Ar Rayaan, Eshbilya and Al Kawthar.
  • Water pooling at the drain opening is what most often leaks through small bathrooms over time.
What the service includes

The main items of bathroom waterproofing in Al Adhiriyah

  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Checking the floor, wall bases, corners and the drain opening
  • Leaving the layer to cure before any finish goes over it
  • Cleaning the surface and treating hairline cracks and pipe entries
How we work

The steps of bathroom waterproofing in Al Adhiriyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Al Adhiriyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Adhiriyah comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Adhiriyah

Is the bathroom floor waterproofed before tiling in Al Adhiriyah?

Yes, and this is the easiest time to do it, as the layer is covered fully before the tiles go down. Send photos of the floor at its current stage and we will suggest the right step.

What happens at the drain opening in these bathrooms?

The opening is often a weak point, as the joint between drain and floor shifts over time. We inspect it closely and decide whether it needs treatment before lining.

Do you offer bathroom waterproofing in Al Adhiriyah?

Yes. Al Adhiriyah is within our service area in the Eastern Province, and we also work in Ar Rayaan (near Al Adhiriyah), Eshbilya and Al Kawthar (near Ar Rafiah). Call us or send photos of the spot on WhatsApp.

What materials are used in bathroom waterproofing?

Common materials include flexible cementitious coating applied in layers on damp-tolerant surfaces, liquid membrane applied by brush or roller and shaped by the surface, and bitumen rolls fixed to the floor and wall bases. The choice of material depends on the stage of the work and the nature of the surface.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

How often should a bathroom be waterproofed in a building's life?

There is no fixed interval. The layer is affected by how well it was first applied, by movement in the building, by shocks to the tiles and by changes to the plumbing. The main signal is damp patches appearing or render crumbling at the wall base, not a date. At the first sign, send us a photo.

Nearby areas

Areas near Al Adhiriyah

Nearby areas we also cover: Ar Rayaan (near Al Adhiriyah), Eshbilya and Al Kawthar (near Ar Rafiah).

Other services in the area

More services in Al Adhiriyah

Two workers on the roof insulating around an AC unit

Your first step in Al Adhiriyah:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp