Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Third Industrial Area

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Third Industrial Area

We waterproof bathroom and washroom floors, wall bases and drain openings in the Third Industrial Area, at the build stage or after tiling. Send a photo of the bathroom by call or WhatsApp to establish its condition.

The Third Industrial Area is made up mainly of commercial, administrative and workshop buildings, where washrooms are used heavily for long hours. Floors that see frequent use collect water around outlets and at the wall bases more than elsewhere. The membrane depends on each building's layout and number of facilities, and the photos show what needs treating.

  • The Third Industrial Area is an industrial zone in the Eastern Province, near the Second Industrial Area and Al Fasl.
  • Heavily used washrooms collect water around outlets more than elsewhere, so treatment concentrates on those points.
What the service includes

What the service covers in Third Industrial Area

  • Cleaning the surface and treating hairline cracks and pipe entries
  • Leaving the layer to cure before any finish goes over it
  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Closing the drain opening ring and the bathroom door threshold
How we work

The steps of bathroom waterproofing in Third Industrial Area

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

Your request from Third Industrial Area comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Third Industrial Area with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Third Industrial Area

Do you waterproof washrooms in commercial buildings in the Third Industrial Area?

Yes, we serve the area. Send photos of the washrooms and the number of fixtures, and tell us whether they are under construction or already in use so we can choose the right method.

How are drain outlets treated in heavily used washrooms?

The area around the outlet and the wall base are treated with a continuous membrane that stops water seeping beneath the tiles. The photos determine the right treatment for your case.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Is Third Industrial Area within your service area?

Yes, Third Industrial Area is one of the areas we work in, as are Second Industrial Area, Al Fasl and Industrial Area. To start, call us or message us on WhatsApp.

Can the bathroom floor be waterproofed without lifting the tiles?

In some cases yes: if joints and cracks are limited and the tile surface is sound, sealing the joints or applying a clear waterproof coat over the tiles can work. But if the layer under the tiles is missing or the leak is advanced, lifting them is the right treatment. Send photos and we will advise.

Why does damp appear on the ceiling of the room below the bathroom?

Water gets in through the drain opening, pipe entries or the corner between the floor and the wall, then travels horizontally inside the slab until it appears somewhere else. The stain on the ceiling can be far from the actual entry point. Photos from above and below help us trace the source.

Nearby areas

The same service in nearby areas

We also work near Third Industrial Area, in Second Industrial Area, Al Fasl and Industrial Area.

Other services in the area

More services in Third Industrial Area

Two workers on the roof insulating around an AC unit

Bathroom waterproofing in Third Industrial Area?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp